| Switch class | Unmanaged |
| Application | Home and small office |
| Network architecture | GigabitEthernet |
| Number of 10/100 Mbps ports | None |
| Number of 10/100/1000 Mbps ports | 8 |
| 10/100/1000/2500 Mbps ports | None |
| Number of 10Gb ports | None |
| Number of PoE ports (PoE & PoE+) | None |
| Number of PoE+ ports | 8 |
| Number of COMBO ports | None |
| Number of SFP ports | 2 |
| Number of SFP+ ports | None |
| Number of SFP56 ports | None |
| Number of QSFP+ ports | None |
| Console port | No |
| Throughput | 20 (Gigabajty na sek.) |
| Packet buffer | 128 (Kilobajt) |
| MAC address table size | 2000 |
| Support for Jumbo frames | Yes |
| Jumbo frame size | 9216 (Kilobajt) |
| Supported protocols and standards | - 802.3i
- 802.3u
- 802.3ab
- 802.3x
- 802.3az
- EN 55032:2015 + A1:2020
- EN 55035:2017 + A11:2020
- EN IEC 61000-3-2:2019 + A1:2021
- EN 61000-3-3:2013 + A1:2019
|
| Security | - IP30
- IEC 62368-1:2018
- EN IEC 62368-1:2020+A11:2020
|
| Other functions | - ESD EN 61000-4-2:2009
- Radiated Immunity EN IEC 61000-4-3:2020
- EFT EN 61000-4-4:2012
- Surge Immunity (AC Mains Power Port) EN 61000-4-5:2014 + A1:2017
- CS EN 61000-4-6:2014
- DIP EN IEC 61000-4-11:2020
|
| Chassis type | Rack |
| Chassis type | Desktop |
| Fan | No |
| Power supply | External |
| Power consumption | 240 (Watt) |
| Environment requirements | - Temperatura pracy -40°C do 75°C
- Wilgotność pracy 10% do 90% bez kondensacji
|
| Certificates | - CE
- UKCA
- CITC
- ANRT
- FCC
- IC
- CB
|
| Dimensions | 132 x 44.2 x 95.1 mm |
| Weight | 517 (gram) |
| Designation | CE+WEEE |
| Width | 175 |
| Height | 150 |
| Depth | 70 |
| Weight | 625 |
| Description |
TSW200 PRZEŁĄCZNIK PRZEMYSŁOWY POE+ ETHERNET TSW200 to przemysłowy przełącznik Ethernet z 2 portami SFP do komunikacji światłowodowej dalekiego zasięgu i 8 portami Gigabit Ethernet obsługującymi standardy IEEE802.af i IEE802.3at Power-over-Ethernet. Sklasyfikowany jako sprzęt źródła zasilania (PSE), umożliwia centralizację zasilania, zapewniając do 30 watów na port i zmniejszając wysiłek związany z instalacją zasilania. |